Bourgoin-Jallieu station (38)

Mission G2 AVP

Project owner : SNCF INFRAPOLE RHODANIEN LYON

The SNCF commissioned SOL SOLUTION to carry out geotechnical investigations to characterise the supporting soil (G2 AVP geotechnical engineering mission).

On-site investigations included geological surveys using mechanical shovels, pressure and core sampling and PANDA® light penetrometric tests.

Accompanied by laboratory tests (GTR classifications and water status), a complete characterisation of the subsoil was established.