Pouilly sur Loire (58)

Discover the possible applications of our M3S® geotextile process 

Client : SNCF

Company : GUINOT TP

In partnership with SNCF, we constructed a retaining embankment on the Clermont/Paris line in Pouilly sur Loire (58). This project to secure a landslide embankment stabilised the embankment.

Height : 5 m, length : 220 linear metres.

The work was carried out entirely under suspended power lines and at night.

Services :

  • Dimensioning
  • Supply of M3S®
  • On-site assistance

Stay tuned
This field is for validation purposes and should be left unchanged.